The challenge

Replace a floor over 100 years old with new joists without disturbing the old ones. The new joists also had to go up several flights of stairs, into the room and down into the floor.

What we did

Took a level from the high point and set the new joists to it. Bolted the new joists to the old ones, then bridged the floor and sheeted it.

The result

A level floor on new joists, with the original timbers left in place.